{"data":{"id":"us/48-cfr-236.213","jurisdiction":"us","citation":"48 CFR 236.213","heading":"236.213 Special procedures for sealed bidding in construction contracting.","body":"If it appears that sufficient funds may not be available for all the desired construction features, consider using a bid schedule with additive or deductive items in accordance with PGI 236.213.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 2—DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 236—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 236.2—Special Aspects of Contracting for Construction"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"863eae4ff542ec55232be140f5456a71ab3d81b33b93a712f9fb17c607f453f4","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-236.211","next":"us/48-cfr-236.215"},"notice":"GroundRules: Original legal text. Not legal advice."}
