{"data":{"id":"us/48-cfr-243.204-70-5","jurisdiction":"us","citation":"48 CFR 243.204-70-5","heading":"243.204-70-5 Exceptions.","body":"(a) The limitations in 243.204-70-2, 243.204-70-3, and 243.204-70-4 do not apply to unpriced change orders for the purchase of initial spares.\n(b) The limitations in 243.204-70-4(a) do not apply to unpriced change orders for ship construction and ship repair.\n(c) The head of the agency may waive the limitations in 243.204-70-2, 243.204-70-3, and 243.204-70-4 for unpriced change orders if the head of the agency determines that the waiver is necessary to support—\n(1) A contingency operation; or\n(2) A humanitarian or peacekeeping operation.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 2—DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE","SUBCHAPTER G—CONTRACT MANAGEMENT","PART 243—CONTRACT MODIFICATIONS","Subpart 243.2—Change Orders"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"312bd196bc1537dd3b332fd7d38c48bb4c719a450837a325a689d94561ffeef8","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-243.204-70-4","next":"us/48-cfr-243.204-70-6"},"notice":"GroundRules: Original legal text. Not legal advice."}
