{"data":{"id":"us/48-cfr-247.270-2","jurisdiction":"us","citation":"48 CFR 247.270-2","heading":"247.270-2 Technical provisions.","body":"(a) Because conditions vary at different ports, and sometimes within the same port, it is not practical to develop standard technical provisions covering all phases of stevedoring operations.\n(b) When including rail car, truck, or intermodal equipment loading and unloading, or other dock and terminal work under a stevedoring contract, include these requirements as separate items of work.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 2—DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE","SUBCHAPTER G—CONTRACT MANAGEMENT","PART 247—TRANSPORTATION","Subpart 247.2—Contracts for Transportation or for Transportation-Related Services"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"8e6bd2e1bb6b0fabbc511ec1aef7b478e09895a83c486a745854e507e6b21efa","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-247.270-1","next":"us/48-cfr-247.270-3"},"notice":"GroundRules: Original legal text. Not legal advice."}
