{"data":{"id":"us/48-cfr-30.607","jurisdiction":"us","citation":"48 CFR 30.607","heading":"30.607 Subcontract administration.","body":"When a negotiated CAS price adjustment or a determination of noncompliance is required at the subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the determination to the CFAO for the contractor of the next higher-tier subcontractor. The CFAO of the contractor or the next higher-tier subcontractor shall not change the determination of the CFAO for the lower-tier subcontractor. If the subcontractor refuses to submit a GDM or DCI proposal, remedies are made at the prime contractor level.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 1—FEDERAL ACQUISITION REGULATION","SUBCHAPTER E—GENERAL CONTRACTING REQUIREMENTS","PART 30—COST ACCOUNTING STANDARDS ADMINISTRATION","Subpart 30.6—CAS Administration"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"a838d44eb6aa1bfcf4475c37fc7c7c7edd63a5e4a801b1c6e55c831bdd967701","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-30.606","next":"us/48-cfr-31.000"},"notice":"GroundRules: Original legal text. Not legal advice."}
