{"data":{"id":"us/48-cfr-3034.004","jurisdiction":"us","citation":"48 CFR 3034.004","heading":"3034.004 Acquisition strategy.","body":"See (HSAR) 48 CFR 3009.570 for policy applicable to acquisition strategies that consider the use of lead system integrators.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 30—DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR)","SUBCHAPTER E—GENERAL CONTRACTING REQUIREMENTS","PART 3034—MAJOR SYSTEM ACQUISITION","Subpart 3034.0—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"2bb6faa92421ad9970b3f43c06e35914791b00b9c04935dd63ae147f297cf53c","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-3034.0","next":"us/48-cfr-3035.003"},"notice":"GroundRules: Original legal text. Not legal advice."}
