{"data":{"id":"us/48-cfr-36.204","jurisdiction":"us","citation":"48 CFR 36.204","heading":"36.204 Disclosure of the magnitude of construction projects.","body":"Advance notices and solicitations shall state the magnitude of the requirement in terms of physical characteristics and estimated price range. In no event shall the statement of magnitude disclose the Government's estimate. Therefore, the estimated price should be described in terms of one of the following price ranges:\n(a) Less than $25,000.\n(b) Between $25,000 and $100,000.\n(c) Between $100,000 and $250,000.\n(d) Between $250,000 and $500,000.\n(e) Between $500,000 and $1,000,000.\n(f) Between $1,000,000 and $5,000,000.\n(g) Between $5,000,000 and $10,000,000.\n(h) More than $10,000,000.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 1—FEDERAL ACQUISITION REGULATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 36—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 36.2—Special Aspects of Contracting for Construction"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"6d225937ad6b30897b0d456916752c9d83d2f6570c5ed733851a5178a6cc8e52","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-36.203","next":"us/48-cfr-36.205"},"notice":"GroundRules: Original legal text. Not legal advice."}
