{"data":{"id":"us/48-cfr-36.206","jurisdiction":"us","citation":"48 CFR 36.206","heading":"36.206 Liquidated damages.","body":"The contracting officer must evaluate the need for liquidated damages in a construction contract in accordance with 11.502 and agency regulations.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 1—FEDERAL ACQUISITION REGULATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 36—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 36.2—Special Aspects of Contracting for Construction"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"e81e2e4dc14fc4fccca3dfe5b2d23726fa6da2f2e71315b1ad36cab05df6928b","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-36.205","next":"us/48-cfr-36.207"},"notice":"GroundRules: Original legal text. Not legal advice."}
