{"data":{"id":"us/48-cfr-36.208","jurisdiction":"us","citation":"48 CFR 36.208","heading":"36.208 Concurrent performance of firm-fixed-price and other types of construction contracts.","body":"In view of potential labor and administrative problems, cost-plus-fixed-fee, price-incentive, or other types of contracts with cost variation or cost adjustment features shall not be permitted concurrently, at the same work site, with firm-fixed-price, lump sum, or unit price contracts except with the prior approval of the head of the contracting activity.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 1—FEDERAL ACQUISITION REGULATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 36—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 36.2—Special Aspects of Contracting for Construction"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"4a8248578cc92c95ae90e1d4fe19a81ca2904314894ce4a1b117de88dd9c6cc6","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-36.207","next":"us/48-cfr-36.209"},"notice":"GroundRules: Original legal text. Not legal advice."}
