{"data":{"id":"us/48-cfr-36.303-2","jurisdiction":"us","citation":"48 CFR 36.303-2","heading":"36.303-2 Phase Two.","body":"(a) Phase Two of the solicitation(s) shall be prepared in accordance with part 15, and include phase-two evaluation factors, developed in accordance with 15.304. Examples of potential phase-two technical evaluation factors include design concepts, management approach, key personnel, and proposed technical solutions.\n(b) Phase Two of the solicitation(s) shall require submission of technical and price proposals, which shall be evaluated separately, in accordance with part 15.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 1—FEDERAL ACQUISITION REGULATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 36—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 36.3—Two-Phase Design-Build Selection Procedures"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"42477614707d5a221e1af2285b639fd055ab72493c0c467f6fa1653e483fba44","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-36.303-1","next":"us/48-cfr-36.500"},"notice":"GroundRules: Original legal text. Not legal advice."}
