{"data":{"id":"us/48-cfr-536.101","jurisdiction":"us","citation":"48 CFR 536.101","heading":"536.101 Applicability.","body":"This part supplements FAR Part 36 policies and procedures applicable to contracting for construction and architect-engineer services. Contracts for construction management services are covered by FAR Part 37 and GSAM Part 537. Part 536 shall take precedence when the acquisition involves (1) construction or architect-engineer services, and (2) when the requirement is inconsistent with another part of the GSAR.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 5—GENERAL SERVICES ADMINISTRATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 536—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 536.1—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"0688efdde314d62803844caae48400a6f220df1b6935a35e2d27f1f8a1be6d16","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-533.211","next":"us/48-cfr-536.102"},"notice":"GroundRules: Original legal text. Not legal advice."}
