{"data":{"id":"us/48-cfr-536.515","jurisdiction":"us","citation":"48 CFR 536.515","heading":"536.515 Schedules for construction contracts.","body":"Insert the clause at 552.236-15, Schedules for Construction Contracts, in solicitations and contracts if construction, dismantling, demolition, or removal of improvements is contemplated. Use the clause:\n(a) With its Alternate I when the contract amount is expected to exceed the simplified acquisition threshold and a design-bid-build project delivery method will be followed.\n(b) With its Alternate II when the contract amount is expected to exceed the simplified acquisition threshold and a design-build project delivery method will be followed.\n(c) With its Alternate III when the contract amount is expected to exceed the simplified acquisition threshold and a construction-manager-as-constructor project delivery method will be followed.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 5—GENERAL SERVICES ADMINISTRATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 536—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 536.5—Contract Clauses"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"00445ae32c13d6d9fa5c070cf7531b12acaf6d8d3fee92bc0bc43d03f5c8b021","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-536.511","next":"us/48-cfr-536.521"},"notice":"GroundRules: Original legal text. Not legal advice."}
