{"data":{"id":"us/48-cfr-536.7101","jurisdiction":"us","citation":"48 CFR 536.7101","heading":"536.7101 Scope of subpart.","body":"This subpart describes policies and procedures for the use of the CMc project delivery method.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 5—GENERAL SERVICES ADMINISTRATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 536—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 536.71—Construction-Manager-as-Constructor Contracting"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"fee8ad06fa0f483f06888fc8d4c2beb5d7ed3e53ae5b5945e8810c96b4964e6c","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-536.573","next":"us/48-cfr-536.7102"},"notice":"GroundRules: Original legal text. Not legal advice."}
