{"data":{"id":"us/48-cfr-536.7104","jurisdiction":"us","citation":"48 CFR 536.7104","heading":"536.7104 Construction contract award.","body":"In accordance with FAR 4.1001, the contracting officer shall use the SF 1442 to identify the services or supplies to be acquired as separately identified line items on a unit price or lump sum basis including the design phase services, the construction work GMP option(s), and any other work not included in the previously identified items.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 5—GENERAL SERVICES ADMINISTRATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 536—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 536.71—Construction-Manager-as-Constructor Contracting"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"0585b98e441638d661fe4161a5b41c8357ca69e69f7ee16e3603320aa13e2a18","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-536.7103","next":"us/48-cfr-536.7105"},"notice":"GroundRules: Original legal text. Not legal advice."}
