{"data":{"id":"us/48-cfr-536.7105-6","jurisdiction":"us","citation":"48 CFR 536.7105-6","heading":"536.7105-6 Allowances.","body":"(a) Establishing a separate allowance in addition to the CCA is only permitted pursuant to a written determination approved by the contracting director supporting the use of any such allowance.\n(b) The written determination for a separate allowance in addition to the CCA shall consider the following:\n(1) Alternative contracting structures, such as a separate GMP line item or performing the work as part of the GMP option, and\n(2) Ensuring conformance with all applicable rules and procedures relating to allowances, including FAR 11.702.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 5—GENERAL SERVICES ADMINISTRATION","SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING","PART 536—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS","Subpart 536.71—Construction-Manager-as-Constructor Contracting"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"02f08ecff5f936efaaa9e6f1216588376d8cbe4924cd9644d4308f7f70323e7e","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-536.7105-5","next":"us/48-cfr-536.7105-7"},"notice":"GroundRules: Original legal text. Not legal advice."}
