{"data":{"id":"us/48-cfr-843.205","jurisdiction":"us","citation":"48 CFR 843.205","heading":"843.205 Contract clauses.","body":"As authorized in the introductory text of clauses FAR 52.243-1, Changes—Fixed-Price; FAR 52.243-2, Changes—Cost-Reimbursement; and FAR 52.243-4, Changes, and in the prescription at FAR 43.205(c) for FAR 52.243-3, Changes—Time-and-Materials or Labor-Hours, the contracting officer may vary the period within which a contractor must assert its right to an equitable adjustment but the extended period shall not exceed 60 calendar days.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 8—DEPARTMENT OF VETERANS AFFAIRS","SUBCHAPTER G—CONTRACT MANAGEMENT","PART 843—CONTRACT MODIFICATIONS","Subpart 843.2—Change Orders"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"c2d9e029dd375960d6e5cdcee47b434b7953d7897074afcc73c52306e176cf25","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-842.1202","next":"us/48-cfr-843.205-70"},"notice":"GroundRules: Original legal text. Not legal advice."}
