{"data":{"id":"us/48-cfr-9.106-2","jurisdiction":"us","citation":"48 CFR 9.106-2","heading":"9.106-2 Requests for preaward surveys.","body":"The contracting officer's request to the surveying activity (Preaward Survey of Prospective Contractor (General), SF 1403) shall—\n(a) Identify additional factors about which information is needed;\n(b) Include the complete solicitation package (unless it has previously been furnished), and any information indicating prior unsatisfactory performance by the prospective contractor;\n(c) State whether the contracting office will participate in the survey;\n(d) Specify the date by which the report is required. This date should be consistent with the scope of the survey requested and normally shall allow at least 7 working days to conduct the survey; and\n(e) When appropriate, limit the scope of the survey.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 1—FEDERAL ACQUISITION REGULATION","SUBCHAPTER B—ACQUISITION PLANNING","PART 9—CONTRACTOR QUALIFICATIONS","Subpart 9.1—Responsible Prospective Contractors"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"e13779911e4c19a13d8d876cacbd2f27fa0d2e49a97eea919fbbd4a68a1aaa54","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-9.106-1","next":"us/48-cfr-9.106-3"},"notice":"GroundRules: Original legal text. Not legal advice."}
