{"data":{"id":"us/48-cfr-915.404-4700","jurisdiction":"us","citation":"48 CFR 915.404-4700","heading":"915.404-4700 DOE structured profit and fee system.","body":"(a) This section implements FAR 15.404-4(b) and (d).\n(b) DOE's structured profit and fee system for non-management and operating contracts comprises two approaches: a weighted guidelines system for all but construction contracts, construction management contracts, and special equipment purchases; and a fee schedules-based system for construction contracts, construction management contracts, and special equipment purchases. The former is covered at 915.404-4720 through 915.404-4780; the latter is covered at 915.404-4800 through 915.404-4860. Both approaches use the procedures at 915.404-4900 for cost-plus-award-fee contracts.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 9—DEPARTMENT OF ENERGY","SUBCHAPTER C—CONTRACTING METHODS AND CONTRACT TYPES","PART 915—CONTRACTING BY NEGOTIATION","Subpart 915.4—Contract Pricing"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"c55887ea7e7ef2f90f456b474de0a026dc861acae8fce38ea8e50b855225be0f","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-915.404-4000","next":"us/48-cfr-915.404-4710"},"notice":"GroundRules: Original legal text. Not legal advice."}
