{"data":{"id":"us/48-cfr-925.202","jurisdiction":"us","citation":"48 CFR 925.202","heading":"925.202 Exceptions.","body":"(a)(2) Contracting officers may make the determination required by 48 CFR 25.202(a)(2), if the cost of the materials is not expected to exceed $100,000.","path":["Title 48—Federal Acquisition Regulations System","CHAPTER 9—DEPARTMENT OF ENERGY","SUBCHAPTER D—SOCIOECONOMIC PROGRAMS","PART 925—FOREIGN ACQUISITION","Subpart 925.2—Buy American Act—Construction Materials"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-48.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:29Z","sha256":"e0a9da036beadbb7117eb217fbb372c3375a0b45e043c70f3f5badd7e43de630","source_id":"us-cfr","stale":true,"prev":"us/48-cfr-925.103","next":"us/48-cfr-925.701-70"},"notice":"GroundRules: Original legal text. Not legal advice."}
