{"data":{"id":"us/49-cfr-110.110","jurisdiction":"us","citation":"49 CFR 110.110","heading":"Post-award requirements.","body":"The Associate Administrator will close out the grant upon determination that all applicable administrative actions and all required work of the grant are complete. The recipient must submit all financial, performance, and other reports required as a condition of the grant within 90 days after the expiration or termination of the grant. This time frame may be extended by the Associate Administrator for cause.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER A—HAZARDOUS MATERIALS AND OIL TRANSPORTATION","PART 110—HAZARDOUS MATERIALS PUBLIC SECTOR TRAINING AND PLANNING GRANTS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"ee362c75d35057d11752dd023abacf5229440658684025331bafdcb533cec3c1","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-110.100","next":"us/49-cfr-110.120"},"notice":"GroundRules: Original legal text. Not legal advice."}
