{"data":{"id":"us/49-cfr-1150.24","jurisdiction":"us","citation":"49 CFR 1150.24","heading":"Termination of service.","body":"The duration of the service may be determined in the contract between the State and the operator. An operator may not terminate service over a line unless it first provides 60 days' notice of its intent to terminate the service. The notice of intent must be:\n(a) Filed with the State and the Board, and\n(b) Mailed to all persons that have used the line within the 6 months preceding the date of the notice.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER X—SURFACE TRANSPORTATION BOARD","SUBCHAPTER B—RULES OF PRACTICE","PART 1150—CERTIFICATE TO CONSTRUCT, ACQUIRE, OR OPERATE RAILROAD LINES","Subpart C—Modified Certificate of Public Convenience and Necessity"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"8b6c98ed2869d38afc77e7ed2d50e1d6141f0d9e195c8ce7debe18f76e10b5b5","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-1150.23","next":"us/49-cfr-1150.31"},"notice":"GroundRules: Original legal text. Not legal advice."}
