{"data":{"id":"us/49-cfr-130.110","jurisdiction":"us","citation":"49 CFR 130.110","heading":"Consistency with the National Contingency Plan.","body":"(a) A railroad must certify in the response plan that it reviewed the NCP (40 CFR part 300) and that its response plan is consistent with the NCP.\n(b) At a minimum, for consistency with the NCP, a comprehensive response plan must include all of the following:\n(1) Demonstrate a railroad's clear understanding of the Incident Command System and Unified Command and the roles and responsibilities of the Federal On-Scene Coordinator;\n(2) Include procedures to immediately notify the National Response Center; and\n(3) Establish provisions to ensure safety at the response site.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER B—OIL TRANSPORTATION","PART 130—OIL SPILL PREVENTION AND RESPONSE PLANS","Subpart C—Comprehensive Oil Spill Response Plans"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"0946bd05a99fc3641dd5e1af14ace04d70971e92a69320ccce29d67af7b60b55","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-130.105","next":"us/49-cfr-130.115"},"notice":"GroundRules: Original legal text. Not legal advice."}
