{"data":{"id":"us/49-cfr-130.33","jurisdiction":"us","citation":"49 CFR 130.33","heading":"Basic response plan implementation.","body":"If, during transportation of oil subject to this part, a discharge occurs—into or on the navigable waters of the United States; on the adjoining shorelines to the navigable waters; or that may affect natural resources belonging to, appertaining to, or under the exclusive management authority of, the United States—the person transporting the oil shall implement the plan required by § 130.31, in a manner consistent with the National Contingency Plan, 40 CFR part 300, or as otherwise directed by the Federal on-scene coordinator.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER B—OIL TRANSPORTATION","PART 130—OIL SPILL PREVENTION AND RESPONSE PLANS","Subpart B—Basic Spill Response Plans"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"09e25f384ec1c0f9478edb3603d3462bcb8966e890848825ebc8f1957b715b35","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-130.31","next":"us/49-cfr-130.34-130.99"},"notice":"GroundRules: Original legal text. Not legal advice."}
