{"data":{"id":"us/49-cfr-179.300-20","jurisdiction":"us","citation":"49 CFR 179.300-20","heading":"-20 Reports.","body":"(a) Before a tank is placed in service, the inspector shall furnish to the builder, tank owner, Bureau of Explosives and the Secretary, Mechanical Division, Association of American Railroads, a report in approved form certifying that the tank and its equipment comply with all the requirements of this specification.\n(b) For builder's Certificate of Construction, see § 179.5 (b), (c), and (d).","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER C—HAZARDOUS MATERIALS REGULATIONS","PART 179—SPECIFICATIONS FOR TANK CARS","Subpart E—Specifications for Multi-Unit Tank Car Tanks (Classes DOT-106A and 110AW)"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"1180716c1b89e80741b7fa0ad095d95b64371ff6eb531082aa41ad5eebbea686","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-179.300-19","next":"us/49-cfr-179.301"},"notice":"GroundRules: Original legal text. Not legal advice."}
