{"data":{"id":"us/49-cfr-190.401","jurisdiction":"us","citation":"49 CFR 190.401","heading":"Scope.","body":"If PHMSA conducts a facility design and/or construction safety review or inspection in connection with a proposal to construct, expand, or operate a gas, hazardous liquid or carbon dioxide pipeline facility, or a liquefied natural gas facility that meets the applicability requirements in § 190.403, PHMSA may require the applicant proposing the project to pay the costs incurred by PHMSA relating to such review, including the cost of design and construction safety reviews or inspections.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER D—PIPELINE SAFETY","PART 190—PIPELINE SAFETY ENFORCEMENT AND REGULATORY PROCEDURES","Subpart E—Cost Recovery for Design Reviews"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"1a548ed5513b577c5fb7f70cde6b757ddf189a43c037eeeeaffe95726df139b3","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-190.343","next":"us/49-cfr-190.403"},"notice":"GroundRules: Original legal text. Not legal advice."}
