{"data":{"id":"us/49-cfr-192.750","jurisdiction":"us","citation":"49 CFR 192.750","heading":"Launcher and receiver safety.","body":"Any launcher or receiver used after July 1, 2021, must be equipped with a device capable of safely relieving pressure in the barrel before removal or opening of the launcher or receiver barrel closure or flange and insertion or removal of in-line inspection tools, scrapers, or spheres. An operator must use a device to either: Indicate that pressure has been relieved in the barrel; or alternatively prevent opening of the barrel closure or flange when pressurized, or insertion or removal of in-line devices (e.g. inspection tools, scrapers, or spheres), if pressure has not been relieved.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER D—PIPELINE SAFETY","PART 192—TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS","Subpart M—Maintenance"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"8a936485b29b08cee3181ecd91e3e60c3a39bedf44cbc7c390444338587b498c","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-192.749","next":"us/49-cfr-192.751"},"notice":"GroundRules: Original legal text. Not legal advice."}
