{"data":{"id":"us/49-cfr-194.109","jurisdiction":"us","citation":"49 CFR 194.109","heading":"Submission of state response plans.","body":"(a) In lieu of submitting a response plan required by § 194.103, an operator may submit a response plan that complies with a state law or regulation, if the state law or regulation requires a plan that provides equivalent or greater spill protection than a plan required under this part.\n(b) A plan submitted under this section must\n(1) Have an information summary required by § 194.113;\n(2) List the names or titles and 24-hour telephone numbers of the qualified individual(s) and at least one alternate qualified individual(s); and\n(3) Ensure through contract or other approved means the necessary private personnel and equipment to respond to a worst case discharge or a substantial threat of such a discharge.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER D—PIPELINE SAFETY","PART 194—RESPONSE PLANS FOR ONSHORE OIL PIPELINES","Subpart B—Response Plans"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"3341fdc963b653e993e72059431e08710cafbb87ca9bc070dd8d12db93db0e6e","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-194.107","next":"us/49-cfr-194.111"},"notice":"GroundRules: Original legal text. Not legal advice."}
