{"data":{"id":"us/49-cfr-194.113","jurisdiction":"us","citation":"49 CFR 194.113","heading":"Information summary.","body":"(a) The information summary for the core plan, required by § 194.107, must include:\n(1) The name and address of the operator; and\n(2) For each response zone which contains one or more line sections that meet the criteria for determining significant and substantial harm as described in § 194.103, a listing and description of the response zones, including county(s) and state(s).\n(b) The information summary for the response zone appendix, required in § 194.107, must include:\n(1) The information summary for the core plan;\n(2) The names or titles and 24-hour telephone numbers of the qualified individual(s) and at least one alternate qualified individual(s);\n(3) The description of the response zone, including county(s) and state(s), for those zones in which a worst case discharge could cause substantial harm to the environment;\n(4) A list of line sections for each pipeline contained in the response zone, identified by milepost or survey station number, or other operator designation;\n(5) The basis for the operator's determination of significant and substantial harm; and\n(6) The type of oil and volume of the worst case discharge.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER D—PIPELINE SAFETY","PART 194—RESPONSE PLANS FOR ONSHORE OIL PIPELINES","Subpart B—Response Plans"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"9f258d0934a34e4fca1aec4adaff77654e3ade7872eae3afe40b2a695d4d43b0","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-194.111","next":"us/49-cfr-194.115"},"notice":"GroundRules: Original legal text. Not legal advice."}
