{"data":{"id":"us/49-cfr-194.7","jurisdiction":"us","citation":"49 CFR 194.7","heading":"Operating restrictions and interim operating authorization.","body":"(a) An operator of a pipeline for which a response plan is required under § 194.101, may not handle, store, or transport oil in that pipeline unless the operator has submitted a response plan meeting the requirements of this part.\n(b) An operator must operate its onshore pipeline facilities in accordance with the applicable response plan.\n(c) The operator of a pipeline line section described in § 194.103(c), may continue to operate the pipeline for two years after the date of submission of a response plan, pending approval or disapproval of that plan, only if the operator has submitted the certification required by § 194.119(e).","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER D—PIPELINE SAFETY","PART 194—RESPONSE PLANS FOR ONSHORE OIL PIPELINES","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"4404a91fac908bb2b0d1fadbc7869647ee6f2c777c7ac1b359589ecc612a04fc","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-194.5","next":"us/49-cfr-194.101"},"notice":"GroundRules: Original legal text. Not legal advice."}
