{"data":{"id":"us/49-cfr-195.128","jurisdiction":"us","citation":"49 CFR 195.128","heading":"Station piping.","body":"Any pipe to be installed in a station that is subject to system pressure must meet the applicable requirements of this subpart.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER D—PIPELINE SAFETY","PART 195—TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE","Subpart C—Design Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"5be59da7a647b222e1f5750657542bfe5edf1840651da2683479e8ced23946d6","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-195.126","next":"us/49-cfr-195.130"},"notice":"GroundRules: Original legal text. Not legal advice."}
