{"data":{"id":"us/49-cfr-195.224","jurisdiction":"us","citation":"49 CFR 195.224","heading":"Welding: Weather.","body":"Welding must be protected from weather conditions that would impair the quality of the completed weld.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER D—PIPELINE SAFETY","PART 195—TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE","Subpart D—Construction"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"22a1726e7d0fc04dccc826313c9141c63c95be503be1d65a6f1446bc1c51fdcd","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-195.222","next":"us/49-cfr-195.226"},"notice":"GroundRules: Original legal text. Not legal advice."}
