{"data":{"id":"us/49-cfr-213.59","jurisdiction":"us","citation":"49 CFR 213.59","heading":"Elevation of curved track; runoff.","body":"(a) If a curve is elevated, the full elevation shall be provided throughout the curve, unless physical conditions do not permit. If elevation runoff occurs in a curve, the actual minimum elevation shall be used in computing the maximum allowable posted timetable operating speed for that curve under § 213.57(b).\n(b) Elevation runoff shall be at a uniform rate, within the limits of track surface deviation prescribed in § 213.63, and it shall extend at least the full length of the spirals. If physical conditions do not permit a spiral long enough to accommodate the minimum length of runoff, part of the runoff may be on tangent track.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER II—FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","PART 213—TRACK SAFETY STANDARDS","Subpart C—Track Geometry"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"ea69868ada3dacba202d27822e61db87caafb069a2977ae931b78fc9de8ea1f0","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-213.57","next":"us/49-cfr-213.63"},"notice":"GroundRules: Original legal text. Not legal advice."}
