{"data":{"id":"us/49-cfr-236.576","jurisdiction":"us","citation":"49 CFR 236.576","heading":"Roadway element.","body":"Roadway elements, except track circuits, including those for test purposes, shall be gaged monthly for height and alinement, and shall be tested at least every 6 months.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER II—FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","PART 236—RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES","Subpart E—Automatic Train Stop, Train Control and Cab Signal Systems"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"8d0a7e844d863ddaeadaac2114463222713fd2af74fecd972b661afb6a0f36d0","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-236.568","next":"us/49-cfr-236.577"},"notice":"GroundRules: Original legal text. Not legal advice."}
