{"data":{"id":"us/49-cfr-236.737","jurisdiction":"us","citation":"49 CFR 236.737","heading":"Cut-section, relayed.","body":"A cut-section where the energy for one track circuit is supplied through front contacts or through front and polar contacts of the track relay for the adjoining track circuit.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER II—FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","PART 236—RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES","Subpart G—Definitions"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"8ed3ee3b05813cbc663ef9cdbd969d0efdf1f0971f10939336723d7182c89980","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-236.736","next":"us/49-cfr-236.738"},"notice":"GroundRules: Original legal text. Not legal advice."}
