{"data":{"id":"us/49-cfr-237.105","jurisdiction":"us","citation":"49 CFR 237.105","heading":"Special inspections.","body":"(a) Each bridge management program shall prescribe a procedure for protection of train operations and for inspection of any bridge that might have been damaged by a natural or accidental event, including but not limited to a flood, fire, earthquake, derailment or vehicular or vessel impact.\n(b) Each bridge management program shall provide for the detection of scour or deterioration of bridge components that are submerged, or that are subject to water flow.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER II—FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","PART 237—BRIDGE SAFETY STANDARDS","Subpart E—Bridge Inspection"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"598725b22004cdb3d74ab833faa7e546dccb00de0afb585d483880b3ce6a0053","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-237.103","next":"us/49-cfr-237.107"},"notice":"GroundRules: Original legal text. Not legal advice."}
