{"data":{"id":"us/49-cfr-299.711","jurisdiction":"us","citation":"49 CFR 299.711","heading":"Inspection, testing, and maintenance program format.","body":"The submission to FRA for each identified subsystem shall consist of two parts—\n(a) The complete inspection, testing, and maintenance program, in its entirety, including all required information prescribed in § 299.701, and all information and procedures required for the railroad and its personnel to implement the program.\n(b) A condensed version of the program that contains only those items identified as safety-critical, per § 299.703 submitted for approval by FRA under § 299.713.","path":["Title 49—Transportation","Subtitle B—Other Regulations Relating to Transportation","CHAPTER II—FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","PART 299—TEXAS CENTRAL RAILROAD HIGH-SPEED RAIL SAFETY STANDARDS","Subpart G—Inspection, Testing, and Maintenance Program"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-49.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:34Z","sha256":"1a41c9e3337a93d625e83b45647ad27293c034440419cef48fb7b8030bc186b6","source_id":"us-cfr","stale":true,"prev":"us/49-cfr-299.709","next":"us/49-cfr-299.713"},"notice":"GroundRules: Original legal text. Not legal advice."}
