{"data":{"id":"us/50-cfr-29.62","jurisdiction":"us","citation":"50 CFR 29.62","heading":"What if I intend to conduct new operations or modify my pre-existing operations?","body":"(a) You must obtain an operations permit before conducting operations that are begun after December 14, 2016 for those new operations in accordance with §§ 29.90 through 29.97, Operations Permit: Application, and all applicable requirements of this subpart.\n(b) You must obtain an operations permit prior to modifying your pre-existing operations for that modification in accordance with §§ 29.90 through 29.97, Operations Permit: Application, and all applicable requirements of this subpart.","path":["Title 50—Wildlife and Fisheries","CHAPTER I—UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR","SUBCHAPTER C—THE NATIONAL WILDLIFE REFUGE SYSTEM","PART 29—LAND USE MANAGEMENT","Subpart D—Management of Non-Federal Oil and Gas Rights"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-50.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:39Z","sha256":"c5264236fb857dbc3159fc299b0676bf0c594a1813ed93cfa4de71b2ac1dc525","source_id":"us-cfr","stale":true,"prev":"us/50-cfr-29.61","next":"us/50-cfr-29.63"},"notice":"GroundRules: Original legal text. Not legal advice."}
