{"data":{"id":"us/50-cfr-86.59","jurisdiction":"us","citation":"50 CFR 86.59","heading":"What does the Service consider when evaluating a project for innovative physical components, technology, or techniques that improve the BIG project?","body":"(a) In evaluating a proposed project under the criterion at § 86.51(c)(2), we consider if the project will include physical components, technology, or techniques that are:\n(1) Newly available; or\n(2) Repurposed in a unique way.\n(b) Examples of the type of innovations we will consider are components, technology, or techniques that:\n(1) Extend the useful life of the BIG-funded project;\n(2) Are designed to allow the operator to save costs, decrease maintenance, or improve operation;\n(3) Are designed to improve BIG-eligible services or amenities;\n(4) Reduce the carbon footprint of the BIG-funded facility. Carbon footprint means the impact of the total set of greenhouse gas emissions;\n(5) Are used during construction specifically to reduce negative environmental impacts, beyond compliance requirements; or\n(6) Improve facility resilience.","path":["Title 50—Wildlife and Fisheries","CHAPTER I—UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR","SUBCHAPTER F—FINANCIAL ASSISTANCE—WILDLIFE AND SPORT FISH RESTORATION PROGRAM","PART 86—BOATING INFRASTRUCTURE GRANT PROGRAM","Subpart E—Project Selection"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-50.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:26:39Z","sha256":"68ab005820a0f1cc58cf194318639ae8c7fcc55ca51b49d194a42cf02ff0a980","source_id":"us-cfr","stale":true,"prev":"us/50-cfr-86.58","next":"us/50-cfr-86.60"},"notice":"GroundRules: Original legal text. Not legal advice."}
