{"data":{"id":"us/7-cfr-1726.200","jurisdiction":"us","citation":"7 CFR 1726.200","heading":"General requirements.","body":"The borrower must use the procedures described in this subpart where such procedures are required under subparts B through F of this part. The borrower must ensure that arrangements prior to announcement of the award of the contract are such that all bidders are treated fairly and no bidder is given an unfair advantage over other bidders.","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER XVII—RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE","PART 1726—ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES","Subpart G—Procurement Procedures"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"d4902505200ff515c8d1e00837f6ebaf609c415e2cceccade8c46e1d669a67fb","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-1726.177-1726.199","next":"us/7-cfr-1726.201"},"notice":"GroundRules: Original legal text. Not legal advice."}
