{"data":{"id":"us/7-cfr-1726.37","jurisdiction":"us","citation":"7 CFR 1726.37","heading":"OMB control number.","body":"The collection of information requirements in this part have been approved by the Office of Management and Budget and assigned OMB control number 0572-0107.","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER XVII—RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE","PART 1726—ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"d0d58cb7f109e5e575bd1942500d765d70b0f54bb03814c5c2ab77b70404e578","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-1726.36","next":"us/7-cfr-1726.38-1726.49"},"notice":"GroundRules: Original legal text. Not legal advice."}
