{"data":{"id":"us/7-cfr-1726.400","jurisdiction":"us","citation":"7 CFR 1726.400","heading":"Final contract amendment.","body":"As needed, a final contract amendment will be prepared and processed in accordance with § 1726.24(b) prior to or in conjunction with the closeout of the contract.","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER XVII—RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE","PART 1726—ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES","Subpart J—Contract Closeout"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"acb1c3f78794d0817f225fe0fbec780d22339486daeedb562d88b8286b94a20e","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-1726.305-1726.399","next":"us/7-cfr-1726.401"},"notice":"GroundRules: Original legal text. Not legal advice."}