{"data":{"id":"us/7-cfr-1753.82","jurisdiction":"us","citation":"7 CFR 1753.82","heading":"Minor construction closeout.","body":"(a) For minor construction inspected by the borrower's engineer, an original and two copies of Form 771 shall be sent to the GFR. The GFR will initial and return the original and one copy.\n(b) When funds are requested for minor construction, the original Form 771 signed or initialed by the GFR, shall be submitted with the FRS. Forms 771 should be submitted only with the FRS which they support. RUS does not encumber funds pursuant to Forms 771 unless an advance is made to the borrower. (See 7 CFR part 1744 subpart C).","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER XVII—RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE","PART 1753—TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES","Subpart I—Minor Construction"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"3ca2a85350184ae14a50863fbdefc0c593146cf3ae92a0431739de968e6e7ce1","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-1753.81","next":"us/7-cfr-1753.83-1753.90"},"notice":"GroundRules: Original legal text. Not legal advice."}
