{"data":{"id":"us/7-cfr-1780.55","jurisdiction":"us","citation":"7 CFR 1780.55","heading":"Preliminary engineering reports and environmental review documentation.","body":"Preliminary engineering reports (PERs) must conform to customary professional standards. PER guidelines for water, sanitary sewer, solid waste, and storm sewer are available from the Agency. Environmental review documentation must comply with the environmental review requirements in accordance with 7 CFR part 1970.","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER XVII—RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE","PART 1780—WATER AND WASTE LOANS AND GRANTS","Subpart C—Planning, Designing, Bidding, Contracting, Constructing and Inspections"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"dc976d973645db4211d1bfc4ca1f7f62e66a747ec15d5df2b789201599ca9787","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-1780.54","next":"us/7-cfr-1780.56"},"notice":"GroundRules: Original legal text. Not legal advice."}
