{"data":{"id":"us/7-cfr-3430.305","jurisdiction":"us","citation":"7 CFR 3430.305","heading":"Funding restrictions.","body":"(a) Construction. Funds made available under this subpart shall not be used for the construction of a new building or facility or the acquisition, expansion, remodeling, or alteration of an existing facility (including site grading and improvement, and architect fees).\n(b) Indirect costs. Subject to § 3430.54, indirect costs are allowable. However, indirect costs are not allowed on pre- and postdoctoral grants, equipment grants, or conference grants.","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER XXXIV—NATIONAL INSTITUTE OF FOOD AND AGRICULTURE","PART 3430—COMPETITIVE AND NONCOMPETITIVE NON-FORMULA FEDERAL ASSISTANCE PROGRAMS—GENERAL AWARD ADMINISTRATIVE PROVISIONS","Subpart G—Agriculture and Food Research Initiative"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"c518f82ceb6875fcae830881f7ad7358b39ea438c8170f964bd9d279385ebad8","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-3430.304","next":"us/7-cfr-3430.306"},"notice":"GroundRules: Original legal text. Not legal advice."}
