{"data":{"id":"us/7-cfr-58.214","jurisdiction":"us","citation":"7 CFR 58.214","heading":"General construction, repair and installation.","body":"All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device, flow diversion valve and recorder controller, shall meet the same general requirements as outlined in § 58.128 of this subpart. In addition, for certain other equipment the following requirements shall be met.","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER I—AGRICULTURAL MARKETING SERVICE (STANDARDS, INSPECTIONS, MARKETING PRACTICES), DEPARTMENT OF AGRICULTURE","SUBCHAPTER C—REQUIREMENTS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT","PART 58—GRADING AND INSPECTION, GENERAL SPECIFICATIONS FOR APPROVED PLANTS AND STANDARDS FOR GRADES OF DAIRY PRODUCTS","Subpart B—General Specifications for Dairy Plants Approved for USDA Inspection and Grading Service 1"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"9625d54e5cf0dac2933706e664883b7fa7d15bbb5e3dc08a50385e0b4b4d4443","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-58.213","next":"us/7-cfr-58.215"},"notice":"GroundRules: Original legal text. Not legal advice."}
