{"data":{"id":"us/7-cfr-654.31","jurisdiction":"us","citation":"7 CFR 654.31","heading":"Performing operation and maintenance.","body":"The method of performing O\u0026M is to be at the option of the land user. The NRCS, working through districts, will furnish information and technical assistance as needed and requested to the extent NRCS resources permit.","path":["Title 7—Agriculture","Subtitle B—Regulations of the Department of Agriculture","CHAPTER VI—NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE","SUBCHAPTER F—SUPPORT ACTIVITIES","PART 654—OPERATION AND MAINTENANCE","Subpart C—Conservation Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-7.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:01Z","sha256":"d85d5e382036dd7fc28a3737274aa62957ac38fb4becb03be12def351dc36600","source_id":"us-cfr","stale":true,"prev":"us/7-cfr-654.30","next":"us/7-cfr-654.40"},"notice":"GroundRules: Original legal text. Not legal advice."}
