Browse Federal regulations
Read the original sections, or search by topic.
- 30 CFR 57.19066 · Maximum riders in a conveyance.
- 30 CFR 57.19067 · Trips during shift changes.
- 30 CFR 57.19068 · Orderly conduct in conveyances.
- 30 CFR 57.19069 · Entering and leaving conveyances.
- 30 CFR 57.19070 · Closing cage doors or gates.
- 30 CFR 57.19071 · Riding in skips or buckets.
- 30 CFR 57.19072 · Skips and cages in same compartment.
- 30 CFR 57.19073 · Hoisting during shift changes.
- 30 CFR 57.19074 · Riding the bail, rim, bonnet, or crosshead.
- 30 CFR 57.19075 · Use of open hooks.
- 30 CFR 57.19076 · Maximum speeds for hoisting persons in buckets.
- 30 CFR 57.19077 · Lowering buckets.
- 30 CFR 57.19078 · Hoisting buckets from the shaft bottom.
- 30 CFR 57.19079 · Blocking mine cars.
- 30 CFR 57.19080 · Hoisting tools, timbers, and other materials.
- 30 CFR 57.19081 · Conveyances not in use.
- 30 CFR 57.19083 · Overtravel backout device.
- 30 CFR 57.19090 · Dual signaling systems.
- 30 CFR 57.19091 · Signaling instructions to hoist operator.
- 30 CFR 57.19092 · Signaling from conveyances.
- 30 CFR 57.19093 · Standard signal code.
- 30 CFR 57.19094 · Posting signal code.
- 30 CFR 57.19095 · Location of signal devices.
- 30 CFR 57.19096 · Familiarity with signal code.
- 30 CFR 57.19100 · Shaft landing gates.
- 30 CFR 57.19101 · Stopblocks and derail switches.
- 30 CFR 57.19102 · Shaft guides.
- 30 CFR 57.19103 · Dumping facilities and loading pockets.
- 30 CFR 57.19104 · Clearance at shaft stations.
- 30 CFR 57.19105 · Landings with more than one shaft entrance.
- 30 CFR 57.19106 · Shaft sets.
- 30 CFR 57.19107 · Precautions for work in compartment affected by hoisting operation.
- 30 CFR 57.19108 · Posting warning signs during shaft work.
- 30 CFR 57.19109 · Shaft inspection and repair.
- 30 CFR 57.19110 · Overhead protection for shaft deepening work.
- 30 CFR 57.19111 · Shaft-sinking ladders.
- 30 CFR 57.19120 · Procedures for inspection, testing, and maintenance.
- 30 CFR 57.19121 · Recordkeeping.
- 30 CFR 57.19122 · Replacement parts.
- 30 CFR 57.19129 · Examinations and tests at beginning of shift.
- 30 CFR 57.19130 · Conveyance shaft test.
- 30 CFR 57.19131 · Hoist conveyance connections.
- 30 CFR 57.19132 · Safety catches.
- 30 CFR 57.19133 · Shaft.
- 30 CFR 57.19134 · Sheaves.
- 30 CFR 57.19135 · Rollers in inclined shafts.
- 30 CFR 57.20001 · Intoxicating beverages and narcotics.
- 30 CFR 57.20002 · Potable water.
- 30 CFR 57.20003 · Housekeeping.
- 30 CFR 57.20005 · Carbon tetrachloride.
- 30 CFR 57.20008 · Toilet facilities.
- 30 CFR 57.20009 · Tests for explosive dusts.
- 30 CFR 57.20010 · Retaining dams.
- 30 CFR 57.20011 · Barricades and warning signs.
- 30 CFR 57.20013 · Waste receptacles.
- 30 CFR 57.20014 · Prohibited areas for food and beverages.
- 30 CFR 57.20020 · Unattended mine openings.
- 30 CFR 57.20021 · Abandoned mine openings.
- 30 CFR 57.20031 · Blasting underground in hazardous areas.
- 30 CFR 57.20032 · Two-way communication equipment for underground operations.
- 30 CFR 57.22001 · Scope.
- 30 CFR 57.22002 · Definitions.
- 30 CFR 57.22003 · Mine category or subcategory.
- 30 CFR 57.22004 · Category placement or change in placement.
- 30 CFR 57.22005 · Notice and appeal of placement or change in placement.
- 30 CFR 57.22101 · Smoking (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22102 · Smoking (I-C mines).
- 30 CFR 57.22103 · Open flames (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22104 · Open flames (I-C mines).
- 30 CFR 57.22105 · Smoking and open flames (IV mines).
- 30 CFR 57.22106 · Dust containing volatile matter (I-C mines).
- 30 CFR 57.22201 · Mechanical ventilation (I-A, I-B, I-C, II-A, II-B, III, IV, V-A, and V-B mines).
- 30 CFR 57.22202 · Main fans (I-A, I-B, I-C, II-A, III, V-A, and V-B mines).
- 30 CFR 57.22203 · Main fan operation (I-C mines).
- 30 CFR 57.22204 · Main fan operation and inspection (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22205 · Doors on main fans (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22206 · Main ventilation failure (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22207 · Booster fans (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22208 · Auxiliary fans (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22209 · Auxiliary fans (I-C mines).
- 30 CFR 57.22210 · In-line filters (I-C mines).
- 30 CFR 57.22211 · Air flow (I-A mines).
- 30 CFR 57.22212 · Air flow (I-C, II-A, and V-A mines).
- 30 CFR 57.22213 · Air flow (III mines).
- 30 CFR 57.22214 · Changes in ventilation (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22215 · Separation of intake and return air (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22216 · Separation of intake and return air (I-C mines).
- 30 CFR 57.22217 · Seals and stoppings (I-A, I-B, and I-C mines).
- 30 CFR 57.22218 · Seals and stoppings (III, V-A, and V-B mines).
- 30 CFR 57.22219 · Seals and stoppings (II-A mines).
- 30 CFR 57.22220 · Air passing unsealed areas (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22221 · Overcast and undercast construction (I-A, II-A, III, and V-A mines).
- 30 CFR 57.22222 · Ventilation materials (I-A, I-B, I-C, II-A, III, V-A, and V-B mines).
- 30 CFR 57.22223 · Crosscuts before abandonment (III mines).
- 30 CFR 57.22224 · Auxiliary equipment stations (I-A and III mines).
- 30 CFR 57.22225 · Auxiliary equipment stations (I-C mines).
- 30 CFR 57.22226 · Testing for methane (IV mines).
- 30 CFR 57.22227 · Approved testing devices (I-A, I-B, I-C, II-A, II-B, III, IV, V-A, and V-B mines).
- 30 CFR 57.22228 · Preshift examination (I-A, I-C, II-A, III, and V-A mines).
- 30 CFR 57.22229 · Weekly testing (I-A, III, and V-A mines).