Browse Federal regulations
Read the original sections, or search by topic.
- 30 CFR 203.65 · How long will BSEE take to evaluate my application?
- 30 CFR 203.66 · What happens if BSEE does not act in the time allowed?
- 30 CFR 203.67 · What economic criteria must I meet to get royalty relief on an authorized field or project?
- 30 CFR 203.68 · What pre-application costs will BSEE consider in determining economic viability?
- 30 CFR 203.69 · If my application is approved, what royalty relief will I receive?
- 30 CFR 203.70 · What information must I provide after BSEE approves relief?
- 30 CFR 203.71 · How does BSEE allocate a field's suspension volume between my lease and other leases on my field?
- 30 CFR 203.72 · Can my lease receive more than one suspension volume?
- 30 CFR 203.73 · How do suspension volumes apply to natural gas?
- 30 CFR 203.74 · When will BSEE reconsider its determination?
- 30 CFR 203.75 · What risk do I run if I request a redetermination?
- 30 CFR 203.76 · When might BSEE withdraw or reduce the approved size of my relief?
- 30 CFR 203.77 · May I voluntarily give up relief if conditions change?
- 30 CFR 203.78 · Do I keep relief approved by BSEE under this part for my lease, unit or project if prices rise significantly?
- 30 CFR 203.79 · How do I appeal BSEE's decisions related to royalty relief for a deepwater lease or a development or expansion project?
- 30 CFR 203.80 · When can I get royalty relief if I am not eligible for royalty relief under other sections in the subpart?
- 30 CFR 203.81 · What supplemental reports do royalty-relief applications require?
- 30 CFR 203.82 · What is BSEE's authority to collect this information?
- 30 CFR 203.83 · What is in an administrative information report?
- 30 CFR 203.84 · What is in a net revenue and relief justification report?
- 30 CFR 203.85 · What is in an economic viability and relief justification report?
- 30 CFR 203.86 · What is in a G&G report?
- 30 CFR 203.87 · What is in an engineering report?
- 30 CFR 203.88 · What is in a production report?
- 30 CFR 203.89 · What is in a cost report?
- 30 CFR 203.90 · What is in a fabricator's confirmation report?
- 30 CFR 203.91 · What is in a post-production development report?
- 30 CFR 250.101 · Authority and applicability.
- 30 CFR 250.102 · What does this part do?
- 30 CFR 250.103 · Where can I find more information about the requirements in this part?
- 30 CFR 250.104 · How may I appeal a decision made under BSEE regulations?
- 30 CFR 250.105 · Definitions.
- 30 CFR 250.106 · What standards will the Director use to regulate lease operations?
- 30 CFR 250.107 · What must I do to protect health, safety, property, and the environment?
- 30 CFR 250.108 · What requirements must I follow for cranes and other material-handling equipment?
- 30 CFR 250.109 · What documents must I prepare and maintain related to welding?
- 30 CFR 250.110 · What must I include in my welding plan?
- 30 CFR 250.111 · Who oversees operations under my welding plan?
- 30 CFR 250.112 · What standards must my welding equipment meet?
- 30 CFR 250.113 · What procedures must I follow when welding?
- 30 CFR 250.114 · How must I install, maintain, and operate electrical equipment?
- 30 CFR 250.115 · What are the procedures for, and effects of, incorporation of documents by reference in this part?
- 30 CFR 250.116-250.117 · §§ 250.116-250.117 [Reserved]
- 30 CFR 250.118 · Will BSEE approve gas injection?
- 30 CFR 250.119 · [Reserved]
- 30 CFR 250.120 · How does injecting, storing, or treating gas affect my royalty payments?
- 30 CFR 250.121 · What happens when the reservoir contains both original gas in place and injected gas?
- 30 CFR 250.122 · What effect does subsurface storage have on the lease term?
- 30 CFR 250.123 · [Reserved]
- 30 CFR 250.124 · Will BSEE approve gas injection into the cap rock containing a sulphur deposit?
- 30 CFR 250.125 · Service fees.
- 30 CFR 250.126 · Electronic payment instructions.
- 30 CFR 250.130 · Why does BSEE conduct inspections?
- 30 CFR 250.131 · Will BSEE notify me before conducting an inspection?
- 30 CFR 250.132 · What must I do when BSEE conducts an inspection?
- 30 CFR 250.133 · Will BSEE reimburse me for my expenses related to inspections?
- 30 CFR 250.135 · What will BSEE do if my operating performance is unacceptable?
- 30 CFR 250.136 · How will BSEE determine if my operating performance is unacceptable?
- 30 CFR 250.140 · When will I receive an oral approval?
- 30 CFR 250.141 · May I ever use alternate procedures or equipment?
- 30 CFR 250.142 · How do I receive approval for departures?
- 30 CFR 250.143-250.144 · §§ 250.143-250.144 [Reserved]
- 30 CFR 250.145 · How do I designate an agent or a local agent?
- 30 CFR 250.146 · Who is responsible for fulfilling leasehold obligations?
- 30 CFR 250.150 · How do I name facilities and wells in the Gulf of America Region?
- 30 CFR 250.151 · How do I name facilities in the Pacific Region?
- 30 CFR 250.152 · How do I name facilities in the Alaska Region?
- 30 CFR 250.153 · Do I have to rename an existing facility or well?
- 30 CFR 250.154 · What identification signs must I display?
- 30 CFR 250.160-250.167 · §§ 250.160-250.167 [Reserved]
- 30 CFR 250.168 · May operations or production be suspended?
- 30 CFR 250.169 · What effect does suspension have on my lease?
- 30 CFR 250.170 · How long does a suspension last?
- 30 CFR 250.171 · How do I request a suspension?
- 30 CFR 250.172 · When may the Regional Supervisor grant or direct an SOO or SOP?
- 30 CFR 250.173 · When may the Regional Supervisor direct an SOO or SOP?
- 30 CFR 250.174 · When may the Regional Supervisor grant or direct an SOP?
- 30 CFR 250.175 · When may the Regional Supervisor grant an SOO?
- 30 CFR 250.176 · Does a suspension affect my royalty payment?
- 30 CFR 250.177 · What additional requirements may the Regional Supervisor order for a suspension?
- 30 CFR 250.180 · What am I required to do to keep my lease term in effect?
- 30 CFR 250.181-250.185 · §§ 250.181-250.185 [Reserved]
- 30 CFR 250.186 · What reporting information and report forms must I submit?
- 30 CFR 250.187 · What are BSEE's incident reporting requirements?
- 30 CFR 250.188 · What incidents must I report to BSEE and when must I report them?
- 30 CFR 250.189 · Reporting requirements for incidents requiring immediate notification.
- 30 CFR 250.190 · Reporting requirements for incidents requiring written notification.
- 30 CFR 250.191 · How does BSEE conduct incident investigations?
- 30 CFR 250.192 · What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
- 30 CFR 250.193 · Reports and investigations of possible violations.
- 30 CFR 250.194 · How must I protect archaeological resources?
- 30 CFR 250.195 · What notification does BSEE require on the production status of wells?
- 30 CFR 250.196 · Reimbursements for reproduction and processing costs.
- 30 CFR 250.197 · Data and information to be made available to the public or for limited inspection.
- 30 CFR 250.198 · Documents incorporated by reference.
- 30 CFR 250.199 · Paperwork Reduction Act statements—information collection.
- 30 CFR 250.200 · Definitions.
- 30 CFR 250.201 · What plans and information must I submit before I conduct any activities on my lease or unit?
- 30 CFR 250.202 · How must I protect the rights of the Federal government?
- 30 CFR 250.203 · Are there special requirements if my well affects an adjacent property?