Browse Federal regulations
Read the original sections, or search by topic.
- 30 CFR 816.62 · Use of explosives: Preblasting survey.
- 30 CFR 816.64 · Use of explosives: Blasting schedule.
- 30 CFR 816.66 · Use of explosives: Blasting signs, warnings, and access control.
- 30 CFR 816.67 · Use of explosives: Control of adverse effects.
- 30 CFR 816.68 · Use of explosives: Records of blasting operations.
- 30 CFR 816.71 · Disposal of excess spoil: General requirements.
- 30 CFR 816.72 · Disposal of excess spoil: Valley fills/head-of-hollow fills.
- 30 CFR 816.73 · Disposal of excess spoil: Durable rock fills.
- 30 CFR 816.74 · Disposal of excess spoil: Preexisting benches.
- 30 CFR 816.79 · Protection of underground mining.
- 30 CFR 816.81 · Coal mine waste: General requirements.
- 30 CFR 816.83 · Coal mine waste: Refuse piles.
- 30 CFR 816.84 · Coal mine waste: Impounding structures.
- 30 CFR 816.87 · Coal mine waste: Burning and burned waste utilization.
- 30 CFR 816.89 · Disposal of noncoal mine wastes.
- 30 CFR 816.95 · Stabilization of surface areas.
- 30 CFR 816.97 · Protection of fish, wildlife, and related environmental values.
- 30 CFR 816.99 · Slides and other damage.
- 30 CFR 816.100 · Contemporaneous reclamation.
- 30 CFR 816.101 · [Reserved]
- 30 CFR 816.102 · Backfilling and grading: General requirements.
- 30 CFR 816.104 · Backfilling and grading: Thin overburden.
- 30 CFR 816.105 · Backfilling and grading: Thick overburden.
- 30 CFR 816.106 · Backfilling and grading: Previously mined areas.
- 30 CFR 816.107 · Backfilling and grading: Steep slopes.
- 30 CFR 816.111 · Revegetation: General requirements.
- 30 CFR 816.113 · Revegetation: Timing.
- 30 CFR 816.114 · Revegetation: Mulching and other soil stabilizing practices.
- 30 CFR 816.116 · Revegetation: Standards for success.
- 30 CFR 816.131 · Cessation of operations: Temporary.
- 30 CFR 816.132 · Cessation of operations: Permanent.
- 30 CFR 816.133 · Postmining land use.
- 30 CFR 816.150 · Roads: general.
- 30 CFR 816.151 · Primary roads.
- 30 CFR 816.180 · Utility installations.
- 30 CFR 816.181 · Support facilities.
- 30 CFR 816.200 · Interpretative rules related to general performance standards.
- 30 CFR 817.1 · Scope.
- 30 CFR 817.2 · Objectives.
- 30 CFR 817.10 · Information collection.
- 30 CFR 817.11 · Signs and markers.
- 30 CFR 817.13 · Casing and sealing of exposed underground openings: General requirements.
- 30 CFR 817.14 · Casing and sealing of underground openings: Temporary.
- 30 CFR 817.15 · Casing and sealing of underground openings: Permanent.
- 30 CFR 817.22 · Topsoil and subsoil.
- 30 CFR 817.41 · Hydrologic-balance protection.
- 30 CFR 817.42 · Hydrologic balance: Water quality standards and effluent limitations.
- 30 CFR 817.43 · Diversions.
- 30 CFR 817.45 · Hydrologic balance: Sediment control measures.
- 30 CFR 817.46 · Hydrologic balance: Siltation structures.
- 30 CFR 817.47 · Hydrologic balance: Discharge structures.
- 30 CFR 817.49 · Impoundments.
- 30 CFR 817.56 · Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
- 30 CFR 817.57 · Hydrologic balance: Stream buffer zones.
- 30 CFR 817.59 · Coal recovery.
- 30 CFR 817.61 · Use of explosives: General requirements.
- 30 CFR 817.62 · Use of explosives: Preblasting survey.
- 30 CFR 817.64 · Use of explosives: General performance standards.
- 30 CFR 817.66 · Use of explosives: Blasting signs, warnings, and access control.
- 30 CFR 817.67 · Use of explosives: Control of adverse effects.
- 30 CFR 817.68 · Use of explosives: Records of blasting operations.
- 30 CFR 817.71 · Disposal of excess spoil: General requirements.
- 30 CFR 817.72 · Disposal of excess spoil: Valley fill/head-of-hollow fills.
- 30 CFR 817.73 · Disposal of excess spoil: Durable rock fills.
- 30 CFR 817.74 · Disposal of excess spoil: Preexisting benches.
- 30 CFR 817.81 · Coal mine waste: General requirements.
- 30 CFR 817.83 · Coal mine waste: Refuse piles.
- 30 CFR 817.84 · Coal mine waste: Impounding structures.
- 30 CFR 817.87 · Coal mine waste: Burning and burned waste utilization.
- 30 CFR 817.89 · Disposal of noncoal mine wastes.
- 30 CFR 817.95 · Stabilization of surface areas.
- 30 CFR 817.97 · Protection of fish, wildlife, and related environmental values.
- 30 CFR 817.99 · Slides and other damage.
- 30 CFR 817.100 · Contemporaneous reclamation.
- 30 CFR 817.102 · Backfilling and grading: General requirements.
- 30 CFR 817.106 · Backfilling and grading: Previously mined areas.
- 30 CFR 817.107 · Backfilling and grading: Steep slopes.
- 30 CFR 817.111 · Revegetation: General requirements.
- 30 CFR 817.113 · Revegetation: Timing.
- 30 CFR 817.114 · Revegetation: Mulching and other soil stabilizing practices.
- 30 CFR 817.116 · Revegetation: Standards for success.
- 30 CFR 817.121 · Subsidence control.
- 30 CFR 817.122 · Subsidence control: Public notice.
- 30 CFR 817.131 · Cessation of operations: Temporary.
- 30 CFR 817.132 · Cessation of operations: Permanent.
- 30 CFR 817.133 · Postmining land use.
- 30 CFR 817.150 · Roads: General.
- 30 CFR 817.151 · Primary roads.
- 30 CFR 817.180 · Utility installations.
- 30 CFR 817.181 · Support facilities.
- 30 CFR 817.200 · Interpretative rules related to general performance standards.
- 30 CFR 819.1 · Scope.
- 30 CFR 819.11 · Auger mining: General.
- 30 CFR 819.13 · Auger mining: Coal recovery.
- 30 CFR 819.15 · Auger mining: Hydrologic balance.
- 30 CFR 819.17 · Auger mining: Subsidence protection.
- 30 CFR 819.19 · Auger mining: Backfilling and grading.
- 30 CFR 819.21 · Auger mining: Protection of underground mining.
- 30 CFR 820.1 · Scope.
- 30 CFR 820.2 · Objective.