Browse Federal regulations
Read the original sections, or search by topic.
- 33 CFR 147.855 · Blind Faith Semi-Sub Facility Safety Zone.
- 33 CFR 147.857 · Tahiti SPAR Facility Safety Zone.
- 33 CFR 147.859 · Safety Zone; Gulfstar 1 SPAR, Mississippi Canyon Block 724, Outer Continental Shelf on the Gulf of America.
- 33 CFR 147.861 · Interim Big Foot TLP Construction Site safety zone.
- 33 CFR 147.863 · Turritella FPSO System Safety Zone.
- 33 CFR 147.865 · Titan SPAR Facility Safety Zone.
- 33 CFR 147.867 · Stampede TLP facility safety zone.
- 33 CFR 147.869 · Safety Zone; Appomattox FPS Facility, Outer Continental Shelf on the Gulf of America.
- 33 CFR 147.871 · Safety Zone, Constitution Spar, Outer Continental Shelf Facility, Green Canyon 680, Gulf of America.
- 33 CFR 147.873 · Safety Zone; Lucius Spar, Outer Continental Shelf Facility, Keathley Canyon 875.
- 33 CFR 147.875 · Safety Zone, Horn Mountain Spar, Outer Continental Shelf Facility, Mississippi Canyon 127.
- 33 CFR 147.877 · Safety Zone, Heidelberg Spar, Outer Continental Shelf Facility, Green Canyon 860.
- 33 CFR 147.879 · Safety Zone; Vito Floating Production System, Outer Continental Shelf Facility, Mississippi Canyon Block 939, Gulf of America
- 33 CFR 147.883 · ANCHOR Floating Production Unit safety zone.
- 33 CFR 147.1102 · Platform GRACE safety zone.
- 33 CFR 147.1103 · Platform GINA safety zone.
- 33 CFR 147.1104 · Platform ELLEN & ELLY safety zone.
- 33 CFR 147.1105 · Platform HONDO safety zone.
- 33 CFR 147.1106 · Exxon Santa Ynez offshore storage and treatment vessel mooring safety zone.
- 33 CFR 147.1107 · Platform GILDA safety zone.
- 33 CFR 147.1108 · Platform EDITH safety zone.
- 33 CFR 147.1109 · Platform HERMOSA safety zone.
- 33 CFR 147.1110 · Platform HARVEST safety zone.
- 33 CFR 147.1111 · Platform EUREKA safety zone.
- 33 CFR 147.1112 · Platform HIDALGO safety zone.
- 33 CFR 147.1113 · Platform GAIL safety zone.
- 33 CFR 147.1114 · Platform HARMONY safety zone.
- 33 CFR 147.1115 · Platform HERITAGE safety zone.
- 33 CFR 147.1116 · Platform IRENE safety zone.
- 33 CFR 148.1 · What is the purpose of this subchapter?
- 33 CFR 148.2 · Who is responsible for implementing this subchapter?
- 33 CFR 148.3 · What Federal agencies are responsible for implementing the Deepwater Port Act?
- 33 CFR 148.5 · How are terms used in this subchapter defined?
- 33 CFR 148.8 · How are certifying entities designated and used for purposes of this subchapter?
- 33 CFR 148.100 · What is the purpose of this subpart?
- 33 CFR 148.105 · What must I include in my application?
- 33 CFR 148.107 · What additional information may be required?
- 33 CFR 148.108 · What if a Federal or State agency or other interested party requests additional information?
- 33 CFR 148.110 · How do I prepare my application?
- 33 CFR 148.115 · How many copies of the application must I send and where must I send them?
- 33 CFR 148.125 · What are the application fees?
- 33 CFR 148.200 · What is the purpose of this subpart?
- 33 CFR 148.205 · How are documents related to the application maintained?
- 33 CFR 148.207 · How and where may I view docketed documents?
- 33 CFR 148.209 · How is the application processed?
- 33 CFR 148.211 · What must I do if I need to change my application?
- 33 CFR 148.213 · How do I withdraw my application?
- 33 CFR 148.215 · What if a port has plans for a deep draft channel and harbor?
- 33 CFR 148.217 · How can a State be designated as an Adjacent Coastal State?
- 33 CFR 148.221 · How do I claim, or object to a claim, that required information is privileged?
- 33 CFR 148.222 · When must public hearings or meetings be held?
- 33 CFR 148.227 · How is a public hearing or meeting reported?
- 33 CFR 148.228 · What if a formal evidentiary hearing is necessary?
- 33 CFR 148.230 · How is notice of a formal hearing given?
- 33 CFR 148.232 · What are the rules for a formal hearing?
- 33 CFR 148.234 · What are the limits of an Administrative Law Judge (ALJ)'s jurisdiction?
- 33 CFR 148.236 · What authority does an Administrative Law Judge (ALJ) have?
- 33 CFR 148.238 · Who are the parties to a formal hearing?
- 33 CFR 148.240 · How does a State or a person intervene in a formal hearing?
- 33 CFR 148.242 · How does a person who is not a party to a formal hearing present evidence at the hearing?
- 33 CFR 148.244 · Who must represent the parties at a formal hearing?
- 33 CFR 148.246 · When is a document considered filed and where should I file it?
- 33 CFR 148.248 · What happens when a document does not contain all necessary information?
- 33 CFR 148.250 · Who must be served before a document is filed?
- 33 CFR 148.252 · What is the procedure for serving a subpoena?
- 33 CFR 148.254 · How is a hearing transcript prepared?
- 33 CFR 148.256 · What happens at the conclusion of a formal hearing?
- 33 CFR 148.276 · When must the application be approved or denied?
- 33 CFR 148.277 · How may Federal agencies and States participate in the application process?
- 33 CFR 148.279 · What are the criteria for approval or denial of an application?
- 33 CFR 148.281 · What happens when more than one application is submitted for a deepwater port in the same application area?
- 33 CFR 148.283 · When is the application process stopped before the application is approved or denied?
- 33 CFR 148.300 · What does this subpart concern?
- 33 CFR 148.305 · What is included in a deepwater port license?
- 33 CFR 148.307 · Who may consult with the Commandant (CG-5P) and MARAD on developing the proposed conditions of a license?
- 33 CFR 148.310 · How long does a license last?
- 33 CFR 148.315 · How is a license amended, transferred, or reinstated?
- 33 CFR 148.320 · How is a license enforced, suspended, or revoked?
- 33 CFR 148.325 · How soon after deepwater port decommissioning must the licensee initiate removal?
- 33 CFR 148.400 · What does this subpart do?
- 33 CFR 148.405 · What are the procedures for notifying the Commandant (CG-5P) of proposed site evaluation and pre-construction testing?
- 33 CFR 148.410 · What are the conditions for conducting site evaluation and pre-construction testing?
- 33 CFR 148.415 · When conducting site evaluation and pre-construction testing, what must be reported?
- 33 CFR 148.420 · When may the Commandant (CG-5P) suspend or prohibit site evaluation or pre-construction testing?
- 33 CFR 148.500 · What does this subpart do?
- 33 CFR 148.505 · How do I apply for an exemption?
- 33 CFR 148.510 · What happens when a petition for exemption involves the interests of an Adjacent Coastal State?
- 33 CFR 148.515 · When is an exemption allowed?
- 33 CFR 148.600 · What is the limit of financial liability?
- 33 CFR 148.605 · How is the limit of liability determined?
- 33 CFR 148.700 · How does the Deepwater Port Act interact with other Federal and State laws?
- 33 CFR 148.702 · How were the environmental review criteria developed?
- 33 CFR 148.705 · What is determined by the environmental evaluation?
- 33 CFR 148.707 · What type of criteria will be used in an environmental review and how will they be applied?
- 33 CFR 148.708 · Must the applicant's proposal reflect potential regulations?
- 33 CFR 148.709 · How are these criteria reviewed and revised?
- 33 CFR 148.710 · What environmental conditions must be satisfied?
- 33 CFR 148.715 · How is an environmental review conducted?
- 33 CFR 148.720 · What are the siting criteria?
- 33 CFR 148.722 · Should the construction plan incorporate best available technology and recommended industry practices?