Browse Federal regulations
Read the original sections, or search by topic.
- 36 CFR 7.49 · Cape Lookout National Seashore.
- 36 CFR 7.50 · Chickasaw Recreation Area.
- 36 CFR 7.51 · Curecanti National Recreation Area.
- 36 CFR 7.52 · Cedar Breaks National Monument.
- 36 CFR 7.53 · Black Canyon of the Gunnison National Monument.
- 36 CFR 7.54 · Theodore Roosevelt National Park.
- 36 CFR 7.55 · Lake Roosevelt National Recreation Area.
- 36 CFR 7.56 · Acadia National Park.
- 36 CFR 7.57 · Lake Meredith National Recreation Area.
- 36 CFR 7.58 · Cape Hatteras National Seashore.
- 36 CFR 7.59 · Grand Portage National Monument.
- 36 CFR 7.60 · Herbert Hoover National Historic Site.
- 36 CFR 7.61 · Fort Caroline National Memorial.
- 36 CFR 7.62 · Lake Chelan National Recreation Area.
- 36 CFR 7.63 · Dinosaur National Monument.
- 36 CFR 7.64 · Petersburg National Battlefield.
- 36 CFR 7.65 · Assateague Island National Seashore.
- 36 CFR 7.66 · North Cascades National Park.
- 36 CFR 7.67 · Cape Cod National Seashore.
- 36 CFR 7.68 · Russell Cave National Monument.
- 36 CFR 7.69 · Ross Lake National Recreation Area.
- 36 CFR 7.70 · Glen Canyon National Recreation Area.
- 36 CFR 7.71 · Delaware Water Gap National Recreation Area.
- 36 CFR 7.72 · Arkansas Post National Memorial.
- 36 CFR 7.73 · Buck Island Reef National Monument.
- 36 CFR 7.74 · Virgin Islands National Park.
- 36 CFR 7.75 · Padre Island National Seashore.
- 36 CFR 7.76 · Wright Brothers National Memorial.
- 36 CFR 7.77 · Mount Rushmore National Memorial.
- 36 CFR 7.78 · Harpers Ferry National Historical Park.
- 36 CFR 7.79 · Amistad Recreation Area.
- 36 CFR 7.80 · Sleeping Bear Dunes National Lakeshore.
- 36 CFR 7.81 · Point Reyes National Seashore.
- 36 CFR 7.82 · Apostle Islands National Lakeshore.
- 36 CFR 7.83 · Ozark National Scenic Riverways.
- 36 CFR 7.84 · Channel Islands National Park.
- 36 CFR 7.85 · Big Thicket National Preserve.
- 36 CFR 7.86 · Big Cypress National Preserve.
- 36 CFR 7.87 · Kaloko-Honokohau National Historical Park.
- 36 CFR 7.88 · Indiana Dunes National Lakeshore.
- 36 CFR 7.89 · New River Gorge National River.
- 36 CFR 7.90 · Chattahoochee River National Recreation Area.
- 36 CFR 7.91 · Whiskeytown Unit, Whiskeytown-Shasta-Trinity National Recreation Area.
- 36 CFR 7.92 · Bighorn Canyon National Recreation Area.
- 36 CFR 7.93 · Guadalupe Mountains National Park.
- 36 CFR 7.94 · Bryce Canyon National Park.
- 36 CFR 7.95 · Pea Ridge National Military Park.
- 36 CFR 7.96 · National Capital Region.
- 36 CFR 7.97 · Golden Gate National Recreation Area.
- 36 CFR 7.100 · Appalachian National Scenic Trail.
- 36 CFR 8.1 · Definitions.
- 36 CFR 8.2 · Basis and purpose.
- 36 CFR 8.3 · Applicability.
- 36 CFR 8.4 · Federal and State labor laws.
- 36 CFR 8.5 · Access for investigators.
- 36 CFR 8.6 · Complaints; appeal.
- 36 CFR 8.7 · Record keeping.
- 36 CFR 8.8 · Filing of labor agreements.
- 36 CFR 8.9 · Posting of regulations.
- 36 CFR 9.1 · Purpose and scope.
- 36 CFR 9.2 · Definitions.
- 36 CFR 9.3 · Access permits.
- 36 CFR 9.4 · Surface disturbance moratorium.
- 36 CFR 9.5 · Recordation.
- 36 CFR 9.6 · Transfers of interest.
- 36 CFR 9.7 · Assessment work.
- 36 CFR 9.8 · Use of water.
- 36 CFR 9.9 · Plan of operations.
- 36 CFR 9.10 · Plan of operations approval.
- 36 CFR 9.11 · Reclamation requirements.
- 36 CFR 9.12 · Supplementation or revision of plan of operations.
- 36 CFR 9.13 · Performance bond.
- 36 CFR 9.14 · Appeals.
- 36 CFR 9.15 · Use of roads by commercial vehicles.
- 36 CFR 9.16 · Penalties.
- 36 CFR 9.17 · Public inspection of documents.
- 36 CFR 9.18 · Surface use and patent restrictions.
- 36 CFR 9.30 · What is the purpose and scope of this subpart?
- 36 CFR 9.31 · When does this subpart apply to me?
- 36 CFR 9.32 · What authorization do I need to conduct operations?
- 36 CFR 9.33 · If I am already operating under an NPS authorization, what do I need to do?
- 36 CFR 9.40 · What do the terms used in this subpart mean?
- 36 CFR 9.50 · Do I need an operations permit for my previously exempt operations?
- 36 CFR 9.51 · How do I apply for my operations permit?
- 36 CFR 9.52 · What will the NPS do with my application?
- 36 CFR 9.53 · May I continue to operate while the NPS reviews my application?
- 36 CFR 9.60 · When do I need a temporary access permit?
- 36 CFR 9.61 · How do I apply for a temporary access permit?
- 36 CFR 9.62 · When will the NPS grant a temporary access permit?
- 36 CFR 9.63 · How long will I have to conduct my reconnaissance surveys?
- 36 CFR 9.70 · Do I need an operations permit for accessing oil and gas rights from outside the System unit boundary?
- 36 CFR 9.71 · What information must I submit to the NPS?
- 36 CFR 9.72 · How will the NPS act on my submission?
- 36 CFR 9.73 · If I don't need an operations permit, are there still requirements that I must meet?
- 36 CFR 9.80 · Who must apply for an operations permit?
- 36 CFR 9.81 · May I use previously submitted information?
- 36 CFR 9.82 · What must I include in my application?
- 36 CFR 9.83 · What information must be included in all applications?
- 36 CFR 9.84 · Existing conditions and proposed area of operations.
- 36 CFR 9.85 · Environmental conditions and mitigation actions.